Power distribution
Installation and replacement of switchgear, transformers, panels and feeders, including electrical service upgrades.
Our services
Power distribution, lighting and equipment connections.
We carry out electrical installations, service upgrades and replacement work for commercial and institutional buildings. We coordinate the work with your building team and the other trades involved.
Discuss your requirements
What we do
New construction · Retrofits · Equipment replacement
Installation and replacement of switchgear, transformers, panels and feeders, including electrical service upgrades.
Power connections for building equipment, including heating, cooling and ventilation systems.
Lighting installations and upgrades, with emergency electrical systems included where required by the scope.
Changes to existing electrical systems, with access and shutdowns planned before installation begins.
Planning the work
A new connection or upgrade needs to work with the building’s existing electrical system. We review the equipment requirements, site conditions and installation sequence before the work begins.
Check the equipment ratings, available supply and connection points. Identify any changes needed to panels, feeders or controls.
Confirm cable routes, equipment access and the work needed from other trades. If a shutdown is required, agree on the timing with the building team.
Coordinate testing and any required inspections. Confirm the handover documents and explain any changes that affect building operations.

ECRA / ESA licence #7018731.
Before you get started
Send the building address, a description of the work and details of any new equipment. Existing electrical drawings, panel schedules and equipment nameplates help define the scope. A site review may be needed to confirm the existing supply and installation requirements.
The shutdown plan should identify the affected areas and equipment, the work sequence and the proposed timing. These details need to be agreed with the building team so occupants can be notified and operations can be prepared. Utility involvement, if required, can also affect the schedule.
No. It depends on the existing electrical capacity and the requirements of the new equipment. Those details need to be reviewed before the scope is confirmed. A new connection should not be assumed to fit the existing supply without that review.
Contact us
Share the building location, scope and preferred timing.